Status Shipped In progress Planned Under watch

Q2 2026

April · May · June
  1. Shipped 24 May 2026 · v2.22.0

    Live board pipeline and Initiative refresh

    The Google Form board pipeline went live, and the People and Initiative pages were rebuilt around their data.

    Release notes 29 changes

  2. Shipped 26 May 2026 · v2.23.0

    Brand identity and Initiative depth

    The EISS brand identity replaced the placeholder mark across the site, and the Initiative page grew into a full founding story.

    Release notes 48 changes

  3. Shipped 27 May 2026 · v2.23.1

    Archive banner and post-release polish

    An archive disclaimer ribbon on past-event pages, a translation-ribbon fix, and post-release housekeeping.

    Release notes 14 changes

  4. Shipped 30 May 2026 · v2.24.0

    Live programme depth and a print overhaul

    The ESSC 2026 programme grid gained co-authors and livestream pills, the printed programme was overhauled, and the conference archive filled out.

    Release notes 32 changes

  5. Shipped 9 June 2026 · v2.25.0

    Ready for Stockholm

    The pre-conference release: site-wide search, a public roadmap and a press kit, the whole interface pulled onto one brand blue with redesigned share cards, a markedly better mobile experience, and the ESSC 2026 run-up (countdown, downloadable programmes, add-to-calendar links).

    Release notes 74 changes

  6. Planned 11 - 12 June 2026 · Stockholm

    ESSC 2026 — Stockholm

    The 9th Annual European Security Studies Conference at Stockholm University. The flagship gathering of the year; the website is the canonical entry point for new arrivals.

  7. Planned Late June 2026 · v2.26.0

    Post-conference: activation, content and feedback

    The first release after ESSC 2026, folding in feedback from the conference: new public surfaces (a News surface, an Outputs / Publications page, a Working Groups page, a NetSec co-branding strip), the live programme grid on past conferences with calendar links, and the reliability and accessibility follow-ups carried over from the pre-conference push.

Q3 2026

July · August · September
  1. Planned September 2026 · v2.27.0

    Polish and ESSC 2027 prep

    A build-time guard against CSS class collisions, the mobile nav-drawer alignment refinement, expanded open-panel examples, and the ESSC 2027 announcement rollover. (Site-wide search shipped early, in v2.25.0.)

Under watch

No committed release, waiting on a trigger
  • Under watch Trigger · Indico exposes form state

    Auto-detect registration state from Indico

    Blocked: this Indico build doesn't expose registration-form state on the public or authenticated API, so the status pill stays a manual override.

  • Under watch Trigger · NetSec coordination

    Generalise the Indico sync for NetSec

    Reusing the live programme sync on the sister NetSec site. Waiting on coordination with the NetSec maintainers.

  • Under watch Trigger · source research

    Reconcile archive dates and narratives

    A few contradictory dates and narratives across the older archive pages. Needs source research before any contested fact is edited.

  • Under watch Trigger · a concrete need

    Parked until there's a reason

    Ideas held back without a trigger: custom-domain board emails, a self-hosted newsletter, a multi-author CMS, analytics (the no-analytics stance is deliberate), and a multi-page member directory.

Spotted something missing, or have an idea? The roadmap is public and so is the backlog.